A sense of pride built on achievements

Following our rise to a leadership position in the field of access and safety systems for work at height, INTO has continued to work on major projects.
Our team is proud to showcase its recent achievements.

 


{"autoplay":"false","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Project Data Sheet

Location: Boucherville
Address: 145 Jules-Léger, Boucherville
Year: 2014

About the project and the challenge

Sandoz mandated INTO to provide safe access to several pieces of equipment on a rooftop where the risk of falling had been clearly identified.

{"autoplay":"false","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Project Data Sheet

Location: Gare de Repentigny
Address: 55, boul. Lacombe, Repentigny
Year: 2016

About the project and the challenge

Realizing that workers on the rooftops of the train station in Repentigny faced significant risks of falling, AMT mandated us to implement standards-compliant lifelines and guardrails. A great achievement!

{"autoplay":"false","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Project Data Sheet

Location: CSSS Saint-MIchel
Address: 3130, rue Jarry Est, Montréal
Year: 2015

About the project and the challenge

INTO ensured the safety of workers at CSSS Saint-Michel by bringing all access and safety equipment into compliance with current standards.

  • Division Solution
  • Product Fall protection
  • Project Hydro-Québec
{"autoplay":"false","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}

Project Data Sheet

Location: Hydro-Québec
Address: 75, boul. René-Lévesque, Montréal
Year: 2014

About the project and the challenge

At an apparently innocuous site on René-Lévesque Boulevard, our client asked us to make sure that its employees could access its canopy in complete safety. INTO rose to the challenge.